Ditch 14/Lambert Creek Engineering: Historic & Current Efforts

Lambert Creek/Ditch 14 and its branch ditches have a long and interesting story. To understand how the system works in its entirety, this page was created to list documents that give an understanding of how Ditch 14 came to be, and how it exists in the present.

Click here for the 2018 hydrology and hydraulic survey presentation

History of Lambert Creek video

Ditch 14 Maintenance Projects

Studies: Lambert Creek

Search projects

Birch Lake Aquatic Invasive Species Efforts

Efforts to remove Eurasian Watermilfoil and Curly-leaf Pondweed

4th and Otter Woodland Restoration

A woodland restoration at a key location adjacent to Birch Lake in White Bear Lake.

Birch Lake Sand-Iron Stormwater Filter

An iron-enhanced sand filter at the intersection of 4th St. and Otter Lake Road. The filter helps reduce nutrients entering Birch Lake with stormwater runoff.

Birch Lake North Shoreline Restoration

A 150 foot stretch of lakeshore on Birch Lake, in White Bear Lake was improved in the summer of 2010. In 2011-2012, an additional 700 feet of shoreline was restored on either side of the original planting area.

Charley Lake Channel Restoration

The channel between Charley Lake and Pleasant Lake in North Oaks was showing signs of serious erosion.

Deep Lake Channel Restoration

This project will restore approximately 125 feet of shoreline in the Deep Lake Channel, just before it enters Pleasant Lake. The project will be completed in Fall 2015.
RSS Icon