Quick Facts:

The project consists of two large raingardens, a small raingarden, and a field prairie.

The large basins were built in Summer, 2016, and collect water from almost 15,000 square feet of the property. 

Click here for a spotlight of this project featuring an interview with the head of school Marnie McPhearson.

Funding:

The large basins were funded by a VLAWMO cost-share level 2 grant, a grant from Ramsey Conservation District, and White Bear Montessori School. The small raingarden was built in 2013 using VLAWMO Community Blue/Clean Water Funds funding. 

Reason for project:

The project addresses a long history of issues with water in the school basement, improved storm water runoff and groundwater recharge for the greater area, and serves as an educational tool for students.

Construction:

The project features three boulder walls, specialty soil for infiltration, birch, tamarack and quaking aspen trees, a natural play area, as well as underdrains that direct excess water to the stormdrain during large rain events (over 12” ponding depth).

Results:

White Bear Montessori captures and treats almost all of its stormwater runoff on site. The field prairie is a valuable pollinator habitat featuring walking paths for student exploration, and the raingadrens offer an educational demonstration for green infrastructure and plant care. The large basins reduce stormwater runoff volume, sedimentation, and total phosphorous draining into Lambert Creek. Annual runoff estimates made through the MIDS calculator program:

 

Before

After

Reduction

Reduction %

Volume

(cu-ft/yr)

 

10,849

 

217

 

10,632

 

98%

Total Suspended Solids

(lbs/yr)

 

103.20

 

2.68

 

100.52

 

97%

Total Phosphorous

(lbs/yr)

 

.2745

 

.0101

 

.2644

 

96%

 

 

legacylogo.jpg

camera-gray-textured.png
Project Image Gallery

Search projects

Goodwill Development & Wetland Mitigation

This commercial development took place on a property with a historically degraded wetland, and includes a proactive stormwater plan that benefits the watershed.

Lambert Lake Pond and Meander

An effort to restore floodplain storage, sediment dispersal, and treat high E. coli levels.

Lambert Creek/Ditch 14 Maintenance

Ditch 14/Lambert Creek maintenance activities.

Ditch 14/Lambert Creek Engineering: Historic & Current Efforts

A description and supporting documents for the historical conditions of Lambert Creek/Ditch 14 and its branch ditches

Lambert Creek E. coli Source Study

Lambert Creek - Flume Projects

RSS Icon