Quick Facts:

  • The North Oaks Entrance drains into two nearby wetlands.
  • The wetlands connect to Sucker and eventually East Vadnais Lake.

Funding:

This effort was funded through a combination of VLAWMO Landscape Level 2 grant funds and the North Oaks Home Owner’s Association.

Reason for project:

  • To beautify the entrance.
  • To take a comprehensive approach to support NOHOA’s stormwater and environmental stewardship goals.
  • To address erosion occurring on the sides of the entrance road and side slopes of the two surrounding wetlands.
  • To harness stormwater from the entire entrance area and treat it before discharging to the rest of the watershed.
  • To reduce turf and pavement areas in favor of Minnesota native perennial species
  • To exemplify raingardens to others at a high visibility location.

Construction:

  • Construction timeline: September '22. Planting: Fall ’22 or Spring ’23.
  • Soil replacement, erosion control blankets, coir (coconut husk) logs, and plantings will stabilize the existing erosion along the road sides.
  • The raingarden basin will get excavated to about 12” deep and re-filled with a rich, absorbent compost soil.
  • The raingarden will include four “rain guardian” catchment devices to filter stormwater from the road before it enters the basin and wetlands. These devices help catch large debris and sediment, and are periodically cleaned out to keep sediment from accumulating.
  • An existing stormdrain catchment that takes water from the road directly into the adjacent wetland will be modified into a solid, closed lid.
  • Instead of going through the conventional stormdrain, stormwater will move through the raingarden basin.
  • An underground drain tile will take any water that does not soak in from the bottom of the raingarden basin into the adjacent wetlands. An additional overflow feature will prevent water from ponding on the road during strong rain events.

Results:

  • A slower stormwater discharge that helps reduce peak flows downstream.
  • Valuable storage and filtration upstream from a municipal drinking water resource.
  • Improved soil health through the introduction of native plant root systems
  • Annual reductions into receiving waterbodies: Total suspended solids: 156.6 lbs/yr Total Phosphorus: 1.9 lbs/yr

camera-gray-textured.png
Project Image Gallery

Search projects

Whitaker Pond Biochar Stormwater Filter

A surface water filter targeting pollutants that enter Lambert Creek during high water levels.

Goodwill Development & Wetland Mitigation

This commercial development took place on a property with a historically degraded wetland, and includes a proactive stormwater plan that benefits the watershed.

Lambert Lake Pond and Meander

An effort to restore floodplain storage, sediment dispersal, and treat high E. coli levels.

Lambert Creek/Ditch 14 Maintenance

Ditch 14/Lambert Creek maintenance activities.

Ditch 14/Lambert Creek Engineering: Historic & Current Efforts

A description and supporting documents for the historical conditions of Lambert Creek/Ditch 14 and its branch ditches

Lambert Creek E. coli Source Study

RSS Icon

Warning: Unknown: open(/home/vlawmo/public_html/files/tmp/sess_k6ei6hluuqbrbicdju6q8lp1f7, O_RDWR) failed: No space left on device (28) in Unknown on line 0

Warning: Unknown: Failed to write session data (files). Please verify that the current setting of session.save_path is correct (/home/vlawmo/public_html/files/tmp) in Unknown on line 0