Birch Lake Sand-Iron Stormwater Filter

See the filter in action:

Quick facts:

Amount of iron-enhanced sand in filter: 73.5 Tons

Stormwater catchment area: 52.26 acres

Phosphorus reduction: 8.1 lbs of phosphorus reduced in Birch Lake annually (estimated)

Volume of runoff draining into project area in a 1” rain event: 1,419,083 gallons, 4.36 acre/ft.       

1 acre/ft = 1 football field covered with water 1' deep. 

Filter draw-down time: 48 hours after a rain event

Filter life span: 25 years

  • VLAWMO has an operations & maintenance agreement with the City of White Bear Lake and Ramsey County for minor and major iron-enhanced sand filter maintenance during the 25-year lifespan.

Site history: 

  • The wetland on the northeast corner of 4th Street and Otter Lake Road was modified by agricultural ditching in the early 1900’s. Looking to historical aerial imagery, we can see that the wetland as we know it today has existed since the 1940’s.
  • A housing development was built in the mid 1990’s to the east of the 4th & Otter wetland, and its stormwater was directed into the wetland before it eventually flows south into Birch Lake.

birchlandscape.jpg

Funding:

In the summer of 2017, VLAWMO submitted a Board of Water & Soil Resources (BWSR) Clean Water Fund (CWF) grant application to fund stormwater improvements with an iron-enhanced sand filter. The grant for $93,000 was awarded in December, 2017.

Reason for project:

A history of ditching combined with receiving increased stormwater has been taxing on this wetland, causing it to hold extra nutrients and sediment. The 4th and Otter Lake Road intersection was first identified as a nutrient "hot spot” in 2008 during a preliminary study. At this time, VLAWMO was in the midst of other projects, but bookmarked 4th and Otter for follow-up studies and to seek grant funding.

Data collection and a feasibility study were conducted in 2017-2019.  To collect data, staff used an automated storm sampler that took on-site samples during and after rain events. In 2017, data showed that the wetland was creating a sediment-phosphorus release into Birch Lake. It was determined that this release was a contributor to increasing algae blooms in Birch Lake. The study determined that an iron-enhanced sand filter was the most cost effective and space efficient project to treat stormwater flowing into Birch Lake. The effort was endorsed by the City of White Bear Lake and the Birch Lake Improvement District (BLID) and fit well with VLAWMO’s mission to protect and preserve local water resources.

Visit the Birch Lake page for studies, past projects, and data on Birch Lake, including a lake fact sheet. 

Construction:

VLAWMO worked with project partners at the City of White Bear Lake, the Birch Lake Improvement District, and Ramsey County to develop an Operations & Maintenance Agreement for the 25-year lifespan of the filter. Also included in the agreement as well as site and project coordination. Construction began in April, 2020 with Blackstone Contractors LLC. The graphic below is a general illustration in how iron-enhanced sand filters are designed. 

enhanced text iron sand filter graphic.jpgImage: MPCA

Results:

The completed iron-enhanced sand filter will have a two-fold benefit for local water resources.

Cleaner stormwater entering Birch Lake: The project design takes stormwater from the surrounding neighborhood, passes it through the filter, and sends it into Birch Lake. While in the filter, the water interacts with the iron-enhanced sand (filter media) with a chemistry interaction. The iron-enhanced sand “grabs” onto the phosphorus, holding it in the filter media as the water exits. Using past stormwater data combined with an estimation of how much phosphorus is running off the landscape, it is estimated that the filter reduces phosphorus loading into Birch Lake by 8.1 lbs/year. In context, just one lb of phosphorus can create up to 500 lbs of algae. Cleaner water resources is both a part of VLAWMO's mission and an aid to other waterbodies downstream. 

Improved wetland and vegetation: Before project construction, nutrients and sediment would accumulate in the wetland (see photo). Sedimentation is problematic for wetlands because it chokes out native vegetation and wildlife such as frogs. Many times, a thick stand of cattails is the only plant that can grow in the sediment, which reduces other wetland plants and wildlife spaces. With less sediment draining into the wetland, native vegetation and wildlife have more space to thrive.

Invasive buckthorn shrubs were also removed adjacent to the construction site and the wetland. This removal reduces the amount of leaf-litter that could potentially fall into the filter and reduce its treatment ability over time. Native shade plants were introduced to the site to replace the buckthorn. These native plants were selected for their ability to stay low to the ground yet stabilize the soil with their strong root systems. As the native plants encourage healthy and stabilized soil, they support wildlife such as birds, pollinators, and other wildlife who utilize Birch Lake.

AutomatedSampler-4th&Otter

legacy_logo_rgb.jpg

Slideshow:

Wall constrution 2.jpgSpring tree removal.JPGInstallation parts.jpgNovember before construction.jpgSand.jpgIMG-2727.jpgIMG-2726.jpgIMG_2806.JPGIMG_2804.JPGIMG_2780.JPG

Search projects

Goose Lake Fish Management

Heritage Hall Bioswale

A large raingarden/bio-swale at the offices of the City of Gem Lake.

White Bear Montessori Raingarden

A rundown of the White Bear Montessori 2016 raingarden project.

NOHOA Bioswale

A bioswale retrofit in partnership with the North Oaks Home Owner's Association and Minnesota Water Stewards.

Elmwood Park Raingarden

A large raingarden supporting Lambert Creek in Vadnais Heights.

Native Plant Demonstration at VH Commons

Two native plant gardens in collaboration with the City of Vadnais Heights.
RSS Icon