Wilkinson Deep-Water Wetland Restoration

Current Status: Project is now under construction.

Quick Facts:

  • Wilkinson Lake is impaired for nutrients.
  • Wilkinson Lake receives water from land in 5 cities (North Oaks, White Bear Township, White Bear Lake, Vadnais Heights, and Lino Lakes), 5 upstream lakes (Birch, Tamarack, Black, Amelia, and intermittently Gilfillan), and a total of 3,115 acres.
  • Wilkinson Lake is a strategic location where several waterways come together. Water flows from Wilkinson into Deep and Pleasant Lakes.
  • The project will be located on land owned by North Oaks Farms (DBA North Oaks Company) and is also part of a Minnesota Land Trust Conservation Easement.

Funding:

Grant funds (60% of project cost) are through US Environmental Protection Agency (EPA) 319 funds administered by the Minnesota Pollution Control Agency (MPCA), with a 40% match that is being shared equally between VLAWMO and the North Oaks Company (NOC).

St. Paul Regional Water Services worked with VLAWMO to fund early site sampling and investigation to inform design through a source-water protection grant with the Minnesota Department of Health (2021).

Reason for Project:

  • This project is the first in an anticipated series of projects that will work together to improve water quality and reduce nutrients to improve this impaired waterbody.
  • The project site was selected because it is a key location that brings nutrients into Wilkinson Lake.
  • Wilkinson Lake has an established Total Maximum Daily Load (TMDL) report that provides modeled load reductions needed to improve the lake. The TMDL can be found here.

Excavation:

Houston Engineering, Inc., has provided the project design and specifications in the bid package. See below for a footprint of the deep-water wetland. Houston and VLAWMO conducted the bid opening on August 3, 2023. Construction began in September.

News:

April 2022

March 2023

April 2023

August 2023

October 2023

camera-gray-textured.png
Project Image Gallery

Grading-3 GRADING PLAN_50% Expansion - website small image Sept 23.jpg

Before photos:

Excavation:

Search projects

Oak Knoll Pond/Wood Lake Spent Lime Demonstration Project

An effort to learn more about the use of spent lime for water quality treatment in small waterbodies such as stormponds.

Polar Chevrolet Parking Lot

A parking lot renovation featuring shoreline restoration and sand-iron treatment filters.

East Goose Lake Limited Access Boat Launch

A limited access boat launch for East Goose Lake management.

County Road F Curb-Cut Raingarens

A series of curb-cut raingardens in the East Goose Lake subwatershed.

Lakeaires Elementary Raingarden

A public raingarden treating stormwater reducing erosion in the East Goose Lake subwatershed.

Whitaker Treatment Wetlands

An engineered wetland in White Bear Township to treat polluted stormwater runoff at the headwaters of Lambert Creek.
RSS Icon