Bridgewood Park Curb-Cut Raingarden

Bridgewood 6-13-22 rain event (2).jpg

Quick Facts:

  • .22 acres of impervious area (pavement) drains into the Bridgewood raingarden, and .26 pervious area (grass, trees, etc.)
  • The raingarden removes about 90% of the nutrients and sediment that comes from its drainage area.
  • The raingarden is 785 square feet and has a max depth of 9".
  • The runoff coming from Bridgewood park drains into an adjacent wetland, and that water eventually connects to Lambert Creek and East Vadnais Lake.

Funding:

This effort was funded in partnership with the City of Vadnais Heights, Watershed-based Implementation Funding Program from the Board of Water and Soil Resources (BWSR), and the VLAWMO Landscape Level 2 grant program.

Reasons for project:

  • To support the health, longevity, and holding capacity of the wetland adjacent to Bridgewood Park.
  • To support the wetland adjacent to Bridgewood Park in its ability to support Lambert Creek and East Vadnais Lake.
  • To reduce stress on downstream wetlands and lakes caused by nutrient and sediment loading.
  • To help Vadnais Heights meet its stormwater improvement and volume reduction goals.
  • Contribute to a high quality of life for community and the environment as outlined by the City of Vadnais Heights Parks and Recreation.
  • Park beautification in a high-use public space.

Construction:

  • The construction process started with removing a portion of bituminous pavement and a slab of concrete on the edge of the parking lot. The concrete slab was replaced to form a new walkway that includes an easy access pedestrian ramp.
  • The design of the raingarden was completed in partnership with the Ramsey County Soil and Water Conservation Division.
  • Two “Rain Guardians” act as the intakes for stormwater entering the raingarden. These are also known as a pre-treatment tool because they capture sediment, leaves, and other debris before they washes into the raingarden basin.
  • The raingarden was excavated as deep as 12” down. This reduced the soil compaction that was there before construction from the previous parking lot. The basin allows for runoff infiltration at the site.

Native plants in the raingarden include:

  • Fox sedge, Joe-Pye Weed, Gayfeather (Blazing Star), Switch Grass, Black-eyed Susan, Little Bluestem, Red Twig (Red-Osier) Dogwood, Blueflag Iris, and Black Chokeberry.

Results:

The raingarden provides a valuable space for stormwater treatment and storage, which supports the function and longevity of the nearby wetland and Lambert Creek. The native plants provide habitat for pollinators while also beautifying the parking lot. Using Minimal Impact Design Standards (MIDS), it's estimated that each year, this raingarden:

  • Stores 4,643 bathtubs of stormwater, or 1 football field about 1/2 ft deep
  • Removes 85 lbs of sediment from washing into the nearby wetland and Lambert Creek.
  • Removes .47 lbs of total phosphorus (1 lb of TP can create 500 lbs of algae)

Bridgewood Park Raingarden Interpretative Sign

Video: Lambert Creek Drainage System

legacylogo.jpg

           Legislative Coordinating Commission

camera-gray-textured.png
Project Image Gallery

Search projects

Oak Knoll Pond/Wood Lake Spent Lime Demonstration Project

An effort to learn more about the use of spent lime for water quality treatment in small waterbodies such as stormponds.

Polar Chevrolet Parking Lot

A parking lot renovation featuring shoreline restoration and sand-iron treatment filters.

East Goose Lake Limited Access Boat Launch

A limited access boat launch for East Goose Lake management.

County Road F Curb-Cut Raingarens

A series of curb-cut raingardens in the East Goose Lake subwatershed.

Lakeaires Elementary Raingarden

A public raingarden treating stormwater reducing erosion in the East Goose Lake subwatershed.

Whitaker Treatment Wetlands

An engineered wetland in White Bear Township to treat polluted stormwater runoff at the headwaters of Lambert Creek.
RSS Icon