Saint Mary's of the Lake Raingarden

Quick facts:

In October 2011, a 750 square foot raingarden was installed at the St. Mary’s of the Lake Church in White Bear Lake to capture stormwater from the property’s structural and paved surfaces.

Funding:

Project funding was helped in part by a Clean Water Fund grant with the help of the Ramsey Conservation District.

Reason for project:

The raingarden was found in a study used to identify optimal best management projects that would reduce stormwater in the Lambert Creek subwatershed.

Construction:

The Project removed existing and compacted soils to install a 12” layer of amended soils in the infiltration basin, surrounded with a retaining wall. The inlet features an 8 cubic foot pretreatment chamber to collect sediment and objects from entering the basin, simplifying maintenance.

Results:

The basin has proved to effectively capture and infiltrate stormwater from St. Mary’s of the Lake Church, and the native vegetation has grown in well and continues to flourish.

legacylogo.jpg

camera-gray-textured.png
Project Image Gallery

Search projects

Oak Knoll Pond/Wood Lake Spent Lime Demonstration Project

An effort to learn more about the use of spent lime for water quality treatment in small waterbodies such as stormponds.

Polar Chevrolet Parking Lot

A parking lot renovation featuring shoreline restoration and sand-iron treatment filters.

East Goose Lake Limited Access Boat Launch

A limited access boat launch for East Goose Lake management.

County Road F Curb-Cut Raingarens

A series of curb-cut raingardens in the East Goose Lake subwatershed.

Lakeaires Elementary Raingarden

A public raingarden treating stormwater reducing erosion in the East Goose Lake subwatershed.

Whitaker Treatment Wetlands

An engineered wetland in White Bear Township to treat polluted stormwater runoff at the headwaters of Lambert Creek.
RSS Icon