VLAWMO VLAWMO
About VLAWMO
VLAWMO Planning/Rules
VLAWMO Programs
VLAWMO Projects
VLAWMO Wetland Permits
VLAWMO Education
VLAWMO Watershed Maps
Construction Photos
Lambert Lake January 2005
After Photos
Lambert Lake June 2007 Lambert Lake June 2007 Lambert Lake Channel Spring 2008
VLAWMO Projects
Lambert Lake
In 2005, VLAWMO and SPRWS began work on a site located east of County Road F in Vadnais Heights. A 530-foot low-head weir (a small, overflow dam) with adjustable notches was installed and soil was excavated to create a 1.7 acre pond (called Lambert Lake) and distribute water flow from Lambert Creek into a large wetland area. The holding pond allows nutrients in the water to break down more effectively before reaching Vadnais Lake. Initial results have shown a better than expected reduction in phosphorus and in the amount of flow reaching Vadnais Lake.
VLAWMO The Blue Thumb
Vadnais Lakes Area Water Management Organization

Powered by ICBits